Emergency Response, Disaster Recovery, Environmental Management, Commercial Cleaning and Property Restoration

Case Studies

Ideal Mailing List

Sign up for updates, industry news and Ideal's Top Tips

Map

Trauma Clean in London for Metropolitan Police

The Ideal Group working with Hammersmith & Fulham Metropolitan Police - Trauma Clean to Privately Owned Property.

Upper Slack Farm tenancy clean in Yorkshire

The Ideal Group were notified that the property had been used to cultivate marijuana plants and had been converted into a cannabis farm…

Flood Damage – Universal House Management, London

The Ideal Group responds to a major Commercial Flooding Incident for the Universal House Building, London.

Fire in Recycling Plant - Haverhill

The warehouse had suffered from a serious fire that left the bins, walls and ceiling with major soot damage. Commercial fire decontamination by The Ideal Group.

Major Fire Damage after rioting in Manchester

Major Fire Damage after extensive Rioting in Manchester – Commercial Property;  The Ideal Group responds to a Major Commercial Fire incident on behalf of a Lincolnshire based Construction Company.

Aylesbury Hales Farm Fire

Major Fire Damage – Property Cleaning; The Ideal Group responded to a major fire incident clean up in Aylesbury, Buckinghamshire.

School in Hull - Major Flood Damage

The 2007 summer floods in Hull wreaked havoc to as many as 103 schools, including Sydney Smith School, whose buildings were so badly damaged by the flood waters that everyone including central government was fearful that the restoration work couldn’t be completed before the pupils returned from holiday.

Library in Ealing - Water Damage Restoration

Rapid response saves water-logged library from extended closure.A combination of an immediate response and state-of-the-art equipment prevented a water leak in the library of the university.

Student Accommodation in Middlesex - Fire restoration

Platt Halls of residence are student accommodation blocks.Each one containing eight flats and each flat contains six en‐suite rooms with a communal kitchen and meeting area. They were initially constructed in 1994 using pre‐cast concrete panels with a brick facing, they have been home to thousands students over the years.

Page 1 of 2 pages  1 2 >